Evaluation of BESS Units
Ensures if remediation is required, the core cause is
addressed.
Promotes minimization of equipment requiring
modification, if required.
Verifies the BESS units met the qualifications set
by the BESS unit designer in absence of other
equipment,
Approach meant that for the analysis full CAD of the
inverters was included, but they were considered "off"
(BESS Focus).
Independent evaluation for
the site is performed for
BESS units.