Above Threshold Validation of Full Site Performance Remediation Validation • Following the choice of an effective remediation solution for the BESS units (70° louvers), inverters were incorporated into the analysis. • Showed a minimal change in BESS unit performance, verifying that no inverter remediation would be required. • Overall, showed that with the 70° louver addition it took a site from a position of massive deration requirements to fully passing under worst-case conditions. 0 50 100 150 200 250 300 350 400 45-46 46-47 47-48 48-49 49-50 50-51 51-52 52-53 53-54 54-55 55-56 56-57 57-58 58-59 Number of HVAC Units Temperature Range [C] Worst-Case Site Summary – All Units On (BESS & Inverters) No Louvers 70° Louvers with Inverters