Issue link: https://resources.randsim.com/i/1510288
15 Predicting Wind Power • Noise, energy prediction, unplanned downtime, and maintenance all pose significant issues during wind farm siting and operations • Ansys Multiphysics analysis generated an automated wind farm simulation workflow to assess site output and efficiency • Digital Twins of wind turbines offer predictive analytics to reduce noise, maintenance, and costly downtime • Ansys simulation accelerated design cycles, reduced costs, increased confidence in energy yield, improved wind turbine reliability, and expedited certification timelines Challenge Outcome Solution