Whitepapers

Ansys_LS-DYNA_Example_Workflow - Rand Simulation

Issue link: https://resources.randsim.com/i/1501415

Contents of this Issue

Navigation

Page 7 of 8

E L I T E C H A N N E L PA R T N E R simulation@rand.com | RandSIM.com | 888.483.0674 Step 7 – Define the Floor Once the preload is done, we define the coordinates of the floor that the ball will hit, and the preprocessor creates a RigidWall Planar keycard: Each ball will interact with the same rigid wall located right below them: Step 8 – Implement Global Controls Global control cards are basically global level controls that control model behavior, like end time, mass scaling, unites, hourglass control, and database. Step 9 – Submit Job to the Server Once the model is set up, it is time to set up a job. There are three ways: 1. LS Run – Go to Windows bar, search for LS-Run, point to input deck and LS-DYNA location, define the number of cores to be used and memory requirements Ansys LS-DYNA Simulation Software – An Example Workflow Ansys LS-DYNA Simulation Software – An Example Workflow

Articles in this issue

Links on this page

view archives of Whitepapers - Ansys_LS-DYNA_Example_Workflow - Rand Simulation